DIRECTORATE OF TELECOMMUNICATIONS PERSONAL RECOLLECTIONS Thames Valley Police Memories (1980’s) By: Gordon Wyatt
Looking at Steve's site recently, I came across some very complimentary comments about the standard of engineering of Thames Valley Police post WARC.
Tom Evans was RWE at the start of planning and I was nominated as the Hannington WARC planning officer. Just around this time, Graham Dean arrived and took over as installation SWT, followed by Dave Rumens who became QA SWT.
Both these guy's will I am sure confirm I had hair before I went on a course to learn critical path analysis, shortly followed by a spell at Horseferry house with Brian Hill. Returning from my sessions with Brian I now had two blank green book's for each and every site in the region.
During this period Dave Rumens and his team were heavily involved with Hampshire Fire Service as this was to be our 1st to go live with quasi- synch. Dave made sure that this system was in 1st class order. By this time I had discovered some anomalies between rental sheets and what was actually on site, so poor old Dave was now lumbered with an inventory check on each site as well.
All our Communication Officers were deeply concerned about Quasi-Synchronous operation, so on go live day I took the Hampshire Fire Comms officer wherever he wanted to go in his patch, I had hoped to include the Police Comms officer on this trip (same sites) but he declined at the last moment. The brigade were convinced and a reference for others. This was a day in my life I will always remember for several reasons.
Graham Dean and his installation team were very involved at the time with the installation of the M25 scheme and new Control room at Godstone, together with other projects, so we decided that Dave as well as his phasing activities would also take on the preparation and installation of the high stab ovens. Thames Valley Police being next in line.
|